Bahadori A, Boudaghpour S. Hydro-Economic Assessment of Managed Aquifer Recharge Using Treated Wastewater: A Case Study of the Qotbabad Plain. J Water Soil Sci. 2026; 30 (3) :179-192
URL: http://jstnar.iut.ac.ir/article-1-4570-en.html
Department of Environmental Engineering, Faculty of Civil Engineering, Khajeh Nasir al-Din Toosi University of Technology, Tehran, Iran. , bodaghpour@kntu.ac.ir
Abstract:   (12 Views)
Managed Aquifer Recharge (MAR) using treated wastewater is a viable strategy for water-resource sustainability in arid regions; however, the simultaneous assessment of its hydrogeological and economic aspects remains challenging. The objective of this study was to hydro-economically evaluate the implementation of an MAR project in the Qotb-Abad Plain by integrating numerical modeling and cost-benefit analysis (CBA). The quantitative and qualitative responses of the aquifer were simulated using the MODFLOW and MT3DMS models to estimate changes in groundwater levels, nitrate concentrations, and total dissolved solids (TDS). Economic benefits, including pumping energy savings, the value of stored water, and improvements in water quality, were evaluated alongside capital and operational costs under lower- and upper-bound scenarios. Subsequently, economic indicators, including net present value (NPV), benefit-cost ratio (BCR), internal rate of return (IRR), and payback period, were calculated. The results indicated that implementing MAR with an annual treated wastewater volume of 1.898 million m³ resulted in an approximately 4.5 m rise in groundwater level, accompanied by reductions in TDS from 1859 to 1752 mg/L and in nitrate concentration from 22.2 to 15.4 mg/L by the end of the five-year simulation period. Under the upper-bound scenario, the NPV, BCR, and payback period were 43.7 billion Rials, 1.36, and 3.23 years, respectively. In contrast, the lower-bound scenario was not economically justified, as its BCR was less than 1. Overall, integrating numerical modeling with cost-benefit analysis provides a comprehensive framework for supporting groundwater-management decision-making.
Full-Text [PDF 1024 kb]   (4 Downloads)    
Type of Study: Research | Subject: Ggeneral

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2026 CC BY-NC 4.0 | Journal of Water and Soil Science

Designed & Developed by: Yektaweb

تحت نظارت وف ایرانی